Fleetwood Onsite Conference Recording - Conference presentation capture Contact  |  My Account  |  Cart Contents  |  Checkout   
  Home » ASRW featuring NACE and CARS » ASRW 2013 Conference featuring NACE and CARS » MP3

Previous Product  Product 43 of 45  Next Product   From: ASRW 2013 Conference featuring NACE and CARS

 
 21815 - Advanced Production
[MP3]
$10.00   
Select Format:



Advanced Production
Steve Trapp, Axalta Coating Systems

Format: MP3 download

Most repairers are now implementing blueprinting or repair planning and have refined parts ordering. This session picks up from there discussing production dispatching, body repair flow improvement, paint flow improvement and finally reassembly and QA flow improvement. We will look at repair techniques, new visual scheduling resources, and equipment which will reduce repair cycle time.

  • Understand how important a solid repair plan and kitted parts are to flow
  • Understand how visual dispatching and control systems can prevent vehicle down time
  • Understand how to improve flow through body repair to minimize the repair size and keep technicians touch time to a maximum and reduce cycle time
  • Understand how the prep, edge, stage and paint functions can interlink in an efficient process to paint more vehicles in less time
  • Understand how all the previous departments can minimize the reassembly and QA timelines

 





Customers who bought this product also purchased

21805 - Improving Shop Efficiency and Profitability

21821 - Negotiation Best Practices - Educate, NOT Alienate

21797 - Are You "Repair Planning" Or Are You Still "Estimating" and Calling It "Repair Planning"?

21823 - Hybrid Electric Vehicle Technology: Engage It, Embrace It, and Profit From It - What Are You Waiting For?

21792 - Simple Cycle Time Solutions

21816 - Write-it-Right Best Practices - Mechanics of Estimating

 Copyright © 2024 Fleetwood Onsite Conference Recording


Fleetwood Facebook Page Follow us on Twitter Fleetwood on YouTube